Project

Huddersfield Energy Recycling Facility

Project Value

£1,258,000

Date

June 2021

Job

Murphy Process Engineering Ltd

Overview

The Watermark was to design, manufacture and install support platforms for plant & equipment for the recycling facility

Case Study

Download PDF

Capability

Design, Fabrication, Installation,

gas burner platform

Originally contacted by a new client MPE Ltd acting as Main Contractor to design, manufacture and install support platforms for energy and recycling facility with an initial order placed for £47,000 at the Huddersfield Energy Recycling Facility.

The client provided a preliminary design which required structural calculations and multiple Teams meetings to determine an exact specification.

The client was introduced to GPS site scanning and its benefit in producing a fully compliant 3D model.

The client’s information had discrepancies between theoretical and actual levels which created serious implications for the civils and mechanical works interfaces.

This Energy Recycling Facility solution offered the following benefits:

  • 3D Model was produced from GPS site scan data which highlighted all conflicts

  • Allowed the client to maintain programme within
    budgetary requirements

  • Permitted MPE and the end user Yorkshire Water to manage and
    facilitate HAZOPs

  • On time delivery to provide continuity for the site install teams

  • Project was extended to include platforms, pipe bridges, chutes, structural steelwork, handrailing & canopies